From textile equipment manufacturer in China to global market leader.
From their first days of manufacture, we have worked alongside our client in China to support their ambitious vision.
Case study: Installing a converter platform (TenneT)
Converting offshore wind power at sea and transmitting it to shore. Acting as the certifying authority for safe installation of the BorWin gamma platform.
Case study: Giving TEPCO the confidence to restart nuclear reactors
Independent technical audits for the world’s largest nuclear power plant, Japan, enabling restart following the Fukushima tsunami. Read more in our case study.
Shaping an investor’s commercial strategy.
Shaping an investor’s commercial strategy. Independent assessment and verification of offshore technical elements, Malaysia. Read our case study.
Woodside: Fitting a large rig deck by ‘float-over’ method.
Fitting a large rig deck by ‘float-over’ method. Independent validation of design, construction and installation. Read our case study.
ASC certification aids growth for Loch Fyne Oysters
Loch Fyne Oysters is a seafoods, fish, meat, oysters and game company which also founded the Loch Fyne restaurant chain
EDF Energy relies on LRQA RiskSpectrum to monitor risk at Sizewell B
LRQA's RiskSpectrum suite gives EDF Energy real-time risk monitoring capability, based on a fully validated living PSA model.
Case study - Maintenance cost and risk reduced by 55%.
Maintenance cost and risk reduced by 55%.
Katoni: Make health and safety matter.
Katoni achieves ISO 45001 with LRQA. This case study states the preparation process from OHSAS 18001 to ISO 45001 Katoni took for a successful migration.
DB Schenker: Reaching a quality management milestone.
Reaching a quality management milestone. Certification to ISO 9001:2015, just a month after the revised standard’s publication. Read our case study.